We completed the Mirema Water Tower project, designed to meet high water demands through innovative solutions. This project involved constructing a 10-meter water tower with a load capacity for two 10,000L tanks, borehole equipping, and solar pumping installation.
Key Features:
- 16pcs 550-watt solar panels powering the system.
- 11kw inverter for efficient energy conversion.
- 7.5kw submersible pump, with a capacity of 5000L per hour, dropped at 186 meters.
- HDPE pipeline connecting the system to the storage facility.
Project Timeline:
The Mirema Water Tower project was completed in 31 days, from initiation to handover.
Detailed Project Execution
Site Visit & Preparation:
Each project begins with a comprehensive site visit where data collection and site dynamics are analyzed. This ensures a tailored approach to project design and client needs.
Contract & Down Payment:
Upon signing the contract and receiving the down payment, our team promptly begins foundation and steel works concurrently to expedite the project timeline.
Construction & Communication:
Throughout the process, we maintain open lines of communication with our clients, ensuring they are fully informed of progress, regardless of distance. We prioritize transparency and timely updates on each stage of the project.
Solar & Pump Installation:
After assembling the tower, the solar system and pump are installed to meet the highest standards of efficiency and reliability.
Final Testing & Handover:
Before handover, the entire system undergoes thorough testing to ensure it functions optimally, guaranteeing client satisfaction.
Our Approach:
At Refinar East Africa, we prioritize speed, quality, and client satisfaction. We are also committed to delivering projects efficiently and to the highest standards. The Mirema Water Tower project reflects our dedication to professionalism, communication, and client satisfaction.